I hope all of you are having a great holiday season so far! The construction crews took some time off, but are back in full force.
Bricks are being laid by the new entrance. On the other side of this wall will be our new Museum Store.
![12-26-13 Laying bricks outside new entrance 12-26-13 Bricks](/images/site/Renovations/12-26-13-laying-bricks-outside-new-entrance.jpg?sfvrsn=703a421_2)
Ceiling beams are being painted in Hangar 1.
![12-26-13 Painting Hangar 1 ceiling 12-26-13 Painting H1 ceiling](/images/site/Renovations/12-26-13-painting-hangar-1-ceiling.jpg?sfvrsn=6b03a421_2)
Insulated glass is being installed in the doors of Hangar 2.
![12-26-13 Installing glass in Hangar 2 doors 12-26-13 Glass in H2 doors](/images/site/Renovations/12-26-13-installing-glass-in-hangar-2-doors.jpg?sfvrsn=4a03a421_2)
Ceiling insulation is going up in Hangar 2. (Notice the white panels in the ceiling, and the mezzanine is in the lower left corner of the photo.)
![12-26-13 Installing insulation in Hangar 2 ceiling 12-26-13 H2 ceiling insulation](/images/site/Renovations/12-26-13-installing-insulation-in-hangar-2-ceiling.jpg?sfvrsn=ad02a421_2)
And, work is progressing in our new catering kitchen, located under the mezzanine in Hangar 2.
![12-26-13 Catering kitchen, mezzanine 12-26-13 Catering kitchen, mezzanine](/images/site/Renovations/12-26-13-catering-kitchen-mezzanine.jpg?sfvrsn=8c02a421_2)
Tiffany Meng